国产成人福利美女观看视频_韩国电影中文字幕A级毛片_在线观看国产理论播放网站_国产美女精品自在线拍免费播放_国产亚洲精品精品2020_一本久道久久综合中文字幕_亚洲a成人午夜天堂_午夜福利影院国产_欧美日韩制服丝袜视频_薰衣草实验研究直接进入网站

Location: Home > News

News

What are the improvement schemes of electric arc furnace?

Updated: 2022-04-29 Attention:


What are the improvement schemes of electric arc furnace?

礦熱爐

Improvement scheme of electric arc furnace:


1. Sealing strips shall be installed at the joints of electric arc furnace dust removal cover, mobile cover and fixed cover;


2. The alloy charging cylinder and the amount of flue gas will overflow along the charging cylinder, and an air pipe is installed for pressing;


3. The angle control operation box of fan dust removal valve shall be moved to the site;


4. Time and adjustment revolutions between the fan of dust removal system and smelting.


Well, the above is the introduction of relevant information about electric arc furnace. For more details, please refer to the official website: http://flpx.com.cn/


Key words: submerged arc furnace DC submerged arc furnace DC electric arc furnace


Open
Close
Hotline
Whatsapp
backTop